城市轨道交通敞开式TBM 过站方案及关键技术

王飞   

  1. 中铁第一勘察设计院集团有限公司桥梁隧道处,陕西西安710043
  • 收稿日期:2011-10-26 修回日期:2012-01-15 出版日期:2012-04-15 发布日期:2014-10-31
  • 作者简介:王飞( 1981 - ) ,男( 蒙古族) ,辽宁朝阳人,工程师,硕士,主要从事隧道及地下工程相关设计与研究工作。E-mail: wf5223@163. com。

Open TBM Pass Through Station Plan and Key Technology of Urban Track Transportation

Wang Fei   

  1. Department of Bridge & tunnel,The First Survey & Design Institute Combine Ltd. Company of China Railway, Xi’an 710043,Shaanxi,China
  • Received:2011-10-26 Revised:2012-01-15 Online:2012-04-15 Published:2014-10-31

摘要: 城市轨道交通一般每隔1 ~ 1. 5 km 设一座车站,当采用敞开式TBM 施工时,根据其机型特点、施工方式及工 程筹划,不可避免要遇到较为频繁经过车站的问题。针对国内第1 条采用敞开式TBM 施工的城市轨道交通工程, 根据TBM 所经车站的具体情况,结合车站施工条件及TBM 过站影响,研究确定了TBM 的各种过站方式| 制定了合 理可行的TBM 过站方案和过站应急预案,保证了区间及车站的总工期要求,解决了敞开式TBM 应用于城市轨道交 通的技术难题。为TBM 日后逐渐大规模在城市轨道交通工程中应用提供了技术支持和参考。

关键词: 城市轨道交通, 敞开式TBM, 过站, 区间及车站, 总工期

Abstract: The station generally spacing 1. 0 - 1. 5km of urban track transportation,when using Open TBM to construct,under the models characteristics,construction methods and project planning,it is inevitable to meet the problems of passing through station frequently. Aimed at the first urban track transportation project using Open TBM to construct in domestic, this article have considered idiographic situation with station of TBM passing through,combined with the station constructed condition and the influence of TBM passing through,researched and made sure various passing through station styles of TBM,constituted TBM passing through station schemes and prepared plans reasonably,made sure total project time limit of section and station,solved the technology problems of Open TBM using in urban track transportation,provided technology supporting and reference for TBM using in urban track transportation cosmically and gradually in the future.

Key words: urban track traffic, Open TBM, pass through station, section and station, total project time limit